I went on a tour of the new building this morning without the students before school started. It's amazing to see how much has been done since early Feb., I will be taking the kids out again in May.
This was actually shot from the door near the FC library.
The new library, not much different from other photos I've posted.
The gym is really looking good. This is a huge space which can be divided into two. There will be bleachers over by the orange wall.
The hallway in the 3rd grade wing. Nice to see so much wallboard up!
Some cabinetry in an area that has several small work rooms around it. I'm assuming it will be part of the BEST program perhaps.
This is one of the rectangular 3rd grade classrooms.
The small breakout room between the two rectangular rooms.
The same rectangular room. You can see where the Smartboard will go no the right hand side.
Inside one of the cabinets! Nice to be able to see how we'll be able to put our supplies.
The stage which is part of the lunchroom.
Teachers lunchroom. Smaller than what we have now but it will do just fine.
Part of the cafeteria. It's hard to imagine it's size here since there are a lot of materials stored in here. It's huge and has a wall of windows behind where I was standing.
The school is really taking shape and I'm getting excited about moving in!